Old Opera (Alte Oper)

 

Frankfurt, Germany

Project start: 2001
Completion:

2023

Project type: Renovation
Venue type:

Concert hall, Conference centre

Seats:

Grand hall: 2400 seats (row seating arrangement)                                                          
Mozart hall: 700 seats (row seating arrangement)

The number of seats depends on the hall and seat arrangement

Our services:

Schematic design, design development, construction design, tender documents and construction site supervision for stage machinery

Contact: Client: The building authority of city Frankfurt

 

The renovation of the Old Opera House started in 2001 and has been conducted in phases till 2017. Kunkel Consulting International GmbH designed and supervised the renewal of overstage machinery, movable separation wall (with hydraulic system and control system), understage machinery and transportation lift.

There were following project completion stages:

Services: Design, Tender documents, Construction site supervision
Start of design : 06/2001
Project status: Completed
Start of construction:

06/2002

Completion:

09/2004

Services: Design, Tender documents, Construction site supervision
Start of design: 04/2002
Project status: Completed
Start of construction: 08/2005
Completion:

12/2005

Services: Preliminary design
Start of design: 02/2007
Project status: Completed
Completion:

07/2007

Services: Design, Tender documents, Construction site supervision  
Start of design: 05/2009  
Project status: Completed  
Start of construction: 06/2010  
Completion:

09/2010

 
Services: Design, Tender documents, Construction site supervision
Start of design: 01/2011
Start of construction: 06/2012
Completion: 09/2014
Services: Design, Tender documents, Construction site supervision
Start of design: 01/2015
Project status: The first construction phase is finished.
Start of construction: 07/2016
Completion: 09/2017

After renovation the Old Opera House got multipurpose venues which meet the highest technical requirements. The concert hall can be reconfigured into banquet hall. The state-of-the-art equipment enables all types of events: from classical concert to expert conferences, as well as various festivals. For these purposes the venue has many different seating configurations: row seating, banquet seating, exhibition layout without seating.

Further you will find some technical data about the Old Opera House:

  • Two additional machine stands including access stairs as well as renewal of existing grid level and level of pulleys.
  • 16 powered fly bars, payload: 500kg, v = 1,2 m/s
  • 2 lateral fly bars, payload: 500kg, v = 1,2 m/s
  • 2 wing curtain fly bars, payload: 500 kg, v = 1,2 m/s
  • 14 point hoists with movable wire rope output above stage, payload: 250kg, v = 1,2 m/s
  • 16 point hoists with movable wire rope output above audience, payload: 250kg, v = 0,5 m/s as well as reinforcement of the existing movable point hoist carriages and pulleys
  • 1 main curtain, v=1,5 m/s (Greek (traveller) opening style)
  • Replacement of brakes and gear boxes of the existing ceiling flaps (9 pieces), v = 1,0 m/s
  • 2 motor winches for line arrays, payload: 500kg, v = 0,2 m/s
  • 2 motor winches for line arrays, payload: 1000kg, v = 0,2 m/s
  • Complete electric and electronic layout of the centralized control system including main and secondary control consoles for all drives of the overstage and understage machinery, as well as safety-related equipment.
  • Complete cooling system with cooling unit and heat exchanger for switch cabinets

 

  • Transportation lift with self-rising drive, approx. 6.8 x 3.5m, stroke 14.1m, v = 0,2 m/s
    with 2 secondary lifting platforms, stroke 1.2m, v = 0,2 m/s
  • Various stage platforms between 15m² and 80m², stroke 0.33m – 2.75m
Phase 1 Design

completed

Phase 2 Construction

completed

Phase 3 Handover

in progress