Teatro Verdi

Ferrara, Italy

Project start: 01/2003
Completion: 11/2004
Project type: Renovation
Venue type: Concert hall, Experimental theatre
Seats:

The concert hall is easily reconfigurable into theatre auditorium.

Concert hall: 1200 seats                                                                        Theatre auditorium: 800 seats

Our services:

Schematic design, design development, construction design and preparing of tender documents for stage machinery and stage lighting

Contact: Architect:  Alessandro Traldi, Milano

 

  • Renewal of the steel structure including grid level, level of pulleys
  • 37 manual counterweight fly bars, payload: 500 kg
  • 2 doubled counterweight fly bars, payload: 250 kg
  • 30 auxiliary manual hoists, payload: 250 kg
  • 1 harlequin fly bar (manual), payload: 250 kg
  • 10 electromechanical drive units for manual fly bars
  • 1 lighting hoist below gallery, payload: 500 kg, v = 0,2 m/s
  • 1 house curtain, German (guillotine) and Greek (traveller) opening styles
  • 2 assembly cranes on side stage, payload: 1000 kg, v=4 m/min
  • 3 apron stage powered fly bars, payload: 700 kg, v = 0,3 m/s
  • Technical proscenium (lighting frames and bars)
  • 1 movable trap lift with variable base area
  • 1 transportation platform for assembly area
  • 1 orchestra pit lift
  • 1 movable orchestra railing
  • Stage flooring on a steel profile support structure with trap doors
  • Complete electrical and electronic system including consoles of the aforementioned installations
  • Analogue lighting console with 2048 DMX channels, 24 submasters, including remote control
  • Dimmer system with 3 dimmer cabinets 90 x 3 kVA relay circuits with RCD and 1 dimmer cabinet 54 x 5 kVA relay circuits with RCD
  • Main distribution for stage lighting 400A
  • DMX-512 and Ethernet network
  • Complete renewal of installations including connection boxes
  • Working light, rehearsal light, auditorium light and connection boxes for orchestra pit

 

 

Phase 1 Design

completed

Phase 2 Handover

completed