Renewal of stage machinery including:
- Renewal of the steel structure including grid level, level of pulleys (without main trusses), working galleries and catwalks and their accesses to stage and the backdrop storage room
- 30 powered fly bars, payload: 350kg, v = 1,2 m/s
- 4 lateral fly bars, payload: 350kg, v = 1,2 m/s
- 14 point hoists with movable wire rope output, payload: 250kg, v = 1,2 m/s with movable point hoist carriages and pulleys
- 1 house curtain
- 1 lighting hoist with suspended lighting frame, payload: 1500 kg, v = 0,15 m/s
- 5 manual fly bars with counterweights
- 2 lighting hoists below the galleries, payload: 500 kg, v = 0,15 m/s
- 12 manual winches for the auxiliary stage
- Total renewal of the stage flooring and the support and guiding structures for the understage machinery
- storage elevator system
- 1 fully automatic backdrop storage system
- 1 stage transportation lift
- 1 turntable Ø 12,0 m
- 1 movable trap lift
- 1 hydraulically driven orchestra lift
- Complete hydraulic system, including pumps, piston accumulators, nitrogen-station as well as oil tanks, cooling unit and filter pump unit
- 1 safety curtain between mainstage and side stage
- Smoke slider above the stage
- Smoke hatches
- Complete electric and electronic layout of the centralized control system including main and secondary control consoles for all drives of the overstage and understage machinery as well as the technical safety equipment.
Renewal of stage lighting system including:
- Digital lighting console with 2 monitors and back-up system
- Secondary console as touchscreen panel
- Digital dimmer system with 192x2,5kW and 20x5kW modules.
- Complete distributions
- DMX-512 network
- Total renewal of installation, including connection boxes
- Retrofit of the existing spotlight equipment
Renewal of electroacoustic system including:
- Digital mixing panel
- Amplifying station
- Complete loudspeaker system in the auditorium
- Video- and microport systems
- Stage management system with paging and emergency call for the whole building
Phase 2
Construction
completed
Phase 3
Handover
completed