Zwickau, Germany
Project start: |
05/1993 |
Completion: |
08/1997 |
Project type: |
Renovation |
Venue type: |
Music theatre, Drama theatre, Ballet theatre |
Seats: |
400 seats |
Our services: |
General planner for the complete renovation |
Contact: |
Client: The building authority of city Zwickau |
Renewal of the stage machinery:
- Removal and disposal of the entire machinery
- 19 powered fly bars with electric drive, payload: 3,5 kN, v=0,01 - 1,2 m/s
- 36 powered point hoists, payload: 2,5 kN, v=0,01- 1,2 m/s
- 3 powered lateral fly bars, payload: 3,5kN, v= 0,05 - 0,20 m/s
- 5 powered backstage hoists, payload: 3,5 kN,
v= 0,05 - 0,20 m/s
- 5 powered side stage hoists, payload: 3,5 kN, v= 0,05 - 0,20 m/s
- 1 proscenium lighting bridge
- 1 house curtain with electric motor drive (Greek (traveller) opening style)
- 1 sound curtain with electric motor drive
- 1 scrim with electric motor drive
- 1 turntable
- 1 movable trap lift
- Complete electric and electronic layout of the centralized control system including main and secondary control consoles for all drives of the overstage and understage machinery, as well as the technical safety equipment.
Phase 2
Handover
completed